Apply for New Sui Gas Connection in Pakistan

Getting gas in your kitchen used to mean waiting for years. That has changed. In September 2025, the government lifted the long ban on new domestic connections, and now you can apply for new Sui Gas connection through an online RLNG scheme. 

Apply for New Sui Gas Connection in Pakistan
Steps to Apply for New Sui Gas Connection

Steps to Apply for New Sui Gas Connection

Here is the short steps before the full details:

  • Step 1: Find out whether your area is served by SNGPL or SSGC.
  • Step 2: Keep your CNIC, property papers, and a neighbor's recent gas bill ready.
  • Step 3: Submit the online application on the official portal.
  • Step 4: Wait for the gas survey team to visit and check your address.
  • Step 5: Pay the demand notice (security deposit and charges) at an authorized bank.
  • Step 6: Get the gas meter installed and start using your connection.
Can You Still Get a New Gas Connection in Pakistan?

Can You Still Get a New Gas Connection in Pakistan?

Yes, but with one big change. Pakistan had a ban on new domestic connections because local natural gas was running low. That ban started in 2009, was eased for a while, and was put back in 2022.

In September 2025, the government finally lifted the ban. The catch is that all new domestic connections are now given under the RLNG scheme, not the old system gas scheme. RLNG stands for Regasified Liquefied Natural Gas. It is imported gas that is turned back into usable form and supplied through the same pipelines.

What this means for you:

  • The gas works the same way in your home for cooking and heating.
  • The price is set by OGRA every month and is based on world market rates. There is no subsidy on it, so an RLNG bill is usually higher than the older subsidized rates.
  • If you applied before 2022 under the old system gas list, that application has been cancelled. You must submit a fresh RLNG application.
Who Can Apply for a New Domestic Gas Connection?

Who Can Apply for a New Domestic Gas Connection?

Here are some basic rules. Check that your case fits these basic rules:

  • Your house or shop is a finished building, not an empty plot.
  • A gas pipeline network already passes near your property. New connections are mostly given where the line already exists.
  • You can prove you own the property, or you have the owner's permission if you rent.
  • There are no unpaid gas dues left on the property by a past owner or tenant.
  • Your area is not on a banned or illegal list from the local development authority.

If a pipeline does not reach your street yet, the gas company may mark your property as not feasible. In that case the connection cannot be given until the network reaches your area.

Documents Required for a New Sui Gas Connection

Documents Required for a New Sui Gas Connection

The gas connection documents required are almost the same for SNGPL and SSGC. Keep clear scanned copies ready, and try to keep each file small so it uploads easily.

For property owners:

  • A valid CNIC of the owner, front and back.
  • Property ownership documents, such as the registry, allotment letter, sale deed, or fard.
  • A copy of your neighbor's most recent gas bill. This helps the company find the nearest pipeline. If you do not have it, note the neighbor's consumer number or meter number.

For tenants:

  • A valid CNIC.
  • A signed tenancy agreement.
  • A no objection certificate (NOC) from the property owner.
  • A copy of a neighbor's recent gas bill.

In some cases you may also need a society or housing authority NOC, and an affidavit confirming there are no past gas dues or theft on the property. Use names and details that match exactly across all your papers. A small mismatch is one of the most common reasons forms get delayed.

How to Apply for New Sui Gas Connection with SNGPL (Step by Step)

How to Apply for New Sui Gas Connection with SNGPL (Step by Step)

SNGPL now takes applications online only. You can use the official website or the SNGPL mobile app. Here is the full procedure.

Step 1: Submit the Online Application

Open the official SNGPL new connection page and start the form. Choose the domestic RLNG connection option, and pick either the normal or the fast track category. Fill in your name, CNIC, mobile number, and full address. Enter your neighbor's gas bill reference number so the system can confirm your location. Then upload your CNIC and property documents.

After you submit, you get a tracking or reference number. Save it. You will use it to check your application status later.

Step 2: House Line Survey

A survey team from SNGPL visits your address. Their job is to confirm that your property falls inside the existing gas pipeline network and that a connection is possible. If there is no nearby line, the application may be marked as not feasible.

Step 3: Demand Notice

If the survey is cleared, the company issues a demand notice. This is the official paper that tells you exactly how much to pay. It includes the security deposit and service line charges. The amount on this demand notice is the real figure you should trust, not any rough estimate.

Step 4: Pay the Fee

Pay the demand notice at an authorized bank before the deadline printed on it. If you miss the deadline, your file can drop down the waiting list. Keep the bank receipt safe, because the company can ask for it later. You may also sign the RLNG supply agreement at this stage.

Step 5: House Line and Meter Installation

After payment is confirmed, the distribution team lays the service line pipe to your house and installs the gas meter. This is the new gas meter installation step, and it is done by company staff, not by any outside agent.

Step 6: Gas Supply and First Bill

Once the meter is fitted, the gas supply is switched on. Your meter reading is recorded and billing starts under the RLNG tariff. Your first bill is usually issued within about 45 days of the connection going live. If it does not arrive, contact your area regional office.

How to Apply for New Sui Gas Connection with SSGC (Sindh and Balochistan)

How to Apply for New Sui Gas Connection with SSGC (Sindh and Balochistan)

If you live in Karachi or anywhere in Sindh or Balochistan, you apply through SSGC. The steps are similar, though SSGC often asks you to submit the form in person.

  1. Go to the official SSGC website and open the domestic RLNG connection form. You can fill the web form or download the PDF form.
  2. Complete every field marked as required and attach the same documents listed above (CNIC, property papers, neighbor's bill, and any NOC).
  3. Submit the form. SSGC may ask you to hand in the form and documents at your nearest SSGC facilitation center or branch.
  4. SSGC gives you a temporary customer ID once the request is received.
  5. A survey is carried out, a demand notice is issued, and after payment the meter is installed.

It is a good idea to call the SSGC helpline or visit a facilitation center to confirm the current submission method for your city before you go.

SNGPL or SSGC: Find Your Gas Company First

SNGPL or SSGC: Find Your Gas Company First

Pakistan has two gas companies, and you must apply to the correct one. Applying to the wrong company gets your form rejected.

Gas Company Areas It Serves Major Cities
SNGPL (Sui Northern Gas Pipelines Limited) Punjab, Khyber Pakhtunkhwa, Islamabad, Azad Jammu and Kashmir Lahore, Faisalabad, Rawalpindi, Multan, Peshawar, Islamabad
SSGC (Sui Southern Gas Company) Sindh and Balochistan Karachi, Hyderabad, Sukkur, Larkana, Quetta

If you live in the north, you are an SNGPL consumer. If you live in the south, you are an SSGC consumer. You can confirm your service area on the official SNGPL website before you start. Pick the right one before you start your application.

New Gas Connection Charges and Fees (2026)

New Gas Connection Charges and Fees (2026)

The application itself is free. You pay only after the demand notice is issued. Here are the approximate figures reported for 2026. Your final amount depends on your area and the distance from the nearest pipeline.

Charge Approximate Amount Notes
Online application Free No fee to submit the form
Refundable security deposit (SNGPL) About Rs. 20,000 Returned when the connection is permanently closed
Service line charges (SNGPL) About Rs. 1,500 up to 10 marla; about Rs. 3,000 above 10 marla Higher if the line is far or the case is non standard
Fast track or urgent fee About Rs. 25,000 extra Optional, for faster processing
Standard SSGC domestic connection From about Rs. 21,725 Final amount shown on the demand notice

The security deposit is refundable. The service line and connection charges are usually not refundable unless the company itself cancels your connection for a technical reason. Always pay the exact amount written on your official demand notice.

Once your connection is active, you can check your SNGPL bill online every month to track your charges.

How to Check Your New Gas Connection Application Status

How to Check Your New Gas Connection Application Status

After you apply, you do not have to sit and wait without news. You can track your file easily. This is the gas connection tracking part that gives you peace of mind.

For SNGPL, you can check your application status in these ways:

  • Visit the official SNGPL portal, open the customer services or new connection status page, and enter your 13 digit CNIC number or your tracking reference number.
  • Send your application number by SMS to 0921 to get a quick status update without internet.
  • Call the SNGPL helpline at 1199, which works 24 hours.

For SSGC, use the temporary customer ID given to you, check on the official SSGC website, or call the helpline at 1199.

Your status usually moves through stages like application received, survey pending, and demand notice issued. When the demand notice stage appears, act quickly so you do not miss the payment deadline.

How Long Does the Process Take in 2026?

How Long Does the Process Take in 2026?

The ban was only lifted in 2025, so there is a very large backlog. Reports in mid 2025 noted that more than 3.5 million applications were pending across SNGPL and SSGC together. So timelines can stretch.

Applicant Type Typical Wait Time
City applicant, normal RLNG category About 2 to 4 months
City applicant, fast track category About 2 to 3 months
Rural applicant About 4 to 6 months, depending on the pipeline

These are general ranges, not promises. The biggest factor is whether a gas line already runs near your home. If the network is right outside, things move faster. If a new line must be laid, it takes longer.

How to Transfer an Existing Gas Connection

How to Transfer an Existing Gas Connection

If you bought a house that already has a gas meter, you do not always need a brand new connection. You can apply to transfer the existing connection into your name. This is simpler and avoids the long wait.

For a transfer you generally need:

  • Your CNIC.
  • Proof that you now own the property, such as the sale deed or registry.
  • The latest paid gas bill of the property, with no pending dues.
  • A transfer request submitted to the company.

Clear any unpaid amount first. A connection with old dues will not be transferred until the balance is paid.

Official References

Official References

For the most accurate and current details, always check the official sources:

Final Thoughts & FAQs — New Sui Gas Connection

Final Thoughts

The good news is that you can finally apply for a new Sui Gas connection again after years of waiting. Just remember the three things that matter most: apply to the right company, send clear and matching documents the first time, and pay only against the official demand notice at a bank. Track your application with your CNIC or reference number, and once your meter is live, you can check every monthly bill online using your consumer number.

Frequently Asked Questions

Can I still apply for a normal system gas connection in 2026?
No. New system gas connections are not available for fresh applicants. Since September 2025, all new domestic connections are given under the RLNG scheme.
What documents do I need to apply for a new Sui Gas connection?
You need a valid CNIC, property ownership documents (registry, allotment letter, sale deed, or fard), and a copy of your neighbor's recent gas bill. Tenants also need a tenancy agreement and an owner NOC.
Is the online application free?
Yes. Submitting the application is free. You pay only the security deposit and charges listed on the demand notice after your survey is approved.
How much is the security deposit, and is it refundable?
The SNGPL security deposit is about Rs. 20,000 and is refundable when you permanently close the connection. Service line and connection charges are usually not refundable.
How can I check my new gas connection application status?
SNGPL applicants can check status by entering their 13 digit CNIC or tracking number on the official SNGPL portal, by sending the application number by SMS to 0921, or by calling 1199. SSGC applicants can use their temporary customer ID or call 1199.